|

Phase 1 of the transitway will include four new stations from the City Centre Transit
Terminal to Dixie Station and will open in the fall of 2013. See Phase 1 information
below. (Note: GO Transit will not be operating in Phase 1)
 |
|
(Click to map to enlarge)
|
Routes travelling and/or connecting to Phase 1 of the transitway:
Direction of travel
|
Connecting Station
|
Route
(To view route maps please visit, miway.ca/routemaps) |
|
East/West
(Travelling on the transitway)
|
All Stations |
- Route 21 - Explorer
- Route 107 - Malton Express
- Route 109 - Meadowvale Express
|
North/South
(Connecting to the transitway) |
Central Parkway |
- Route 53 - Kennedy
- Route 65 - Barondale Loop
|
| Tomken |
- Route 51 - Tomken
- Route 51A - Tomken
|
| Dixie |
- Route 5 - Dixie
- Route 5B - Dixie
|
|