In progress Environmental assessment

Creditview Road Environmental Assessment Study

The City has prepared an Addendum to the 2016 Class Environmental Assessment Study for proposed changes to the section of Creditview Road from Bancroft Drive/Sir Monty’s Drive to Argentia Road.

Notice of Addendum

The City has prepared an Addendum to the 2016 Municipal Class Environmental Assessment (MCEA) Study for improvements to Creditview Road from Bancroft Drive/Sir Monty’s Drive to Old Creditview Road, excluding the bridge over the Credit River.

Map of Creditview Road outlining the 2016 environmental assessment study area, the proposed addendum limits, and the 2023 Ministry of Transportation of Ontario works.
Map of Study Area

Construction of the four-lane widening from Argentia Road to Old Creditview Road was completed in 2023, in coordination with the widening of Highway 401 undertaken by the Ministry of Transportation of Ontario (MTO). The Addendum Limits include the remaining Study Area from Bancroft Drive/Sir Monty’s Drive to Argentia Road.

This Addendum is being carried out in accordance with the Municipal Class Environmental Assessment (2024) for ‘Schedule C’ projects, which is a planning and design process approved under the Environmental Assessment Act.

Review the proposed changes outlined in the Addendum:

The Addendum is available for a 30-day review period from February 25 to March 26, 2026. Interested persons may provide written comments to the project contact:

Sonya Bubas, MCIP, RPP
Project Leader, Transportation
Transportation and Works
City of Mississauga
300 City Centre Drive, 8th Floor
Mississauga, ON L5B 3C1

sonya.bubas@mississauga.ca
905-615-3200 ext. 3180

2016 Municipal Class Environmental Assessment Study

View all projects