Documents
-
Assessment of Alternative Design OptionsDec 3, 2025This evaluation was finalized in November 2025. It compares multiple options for three cross-sections along the corridor.
-
Functional Roll PlanDec 3, 2025The functional roll plan is a large-scale, continuous drawing, that shows the proposed detailed design for the Winston Churchill Boulevard corridor from Unity Drive/Unity Gate to The Collegeway.