In progress City project

Implementing the Cycling Master Plan

The City’s latest Cycling Master Plan update was approved by Council on June 24, 2026. Stay up to date with on-going cycling and road safety projects.

The City is transforming into a bicycle-friendly city, where people can choose to cycle for fun, fitness and travel.

Overview

As we continue to build the cycling network, we regularly update the Cycling Master Plan (CMP) to make sure it reflects the needs and values of community members and meets City guidelines such as the Changing Lanes Complete Streets Guide and Vision Zero Action Plan.

The most recent update to the CMP was completed in 2026. We aimed to:

  • Update the City’s planned network to improve connections and follow new design guidance
  • Develop a more equitable approach to implementing cycling facilities in the city
  • Prioritize connections to create a continuous network of cycling infrastructure that accommodates all ages and abilities
  • Make a five-year plan to connect the network
  • Work with interested parties, residents and external partners so that our projects can be implemented and supported by the community

Projects started as part of the previous update in 2018 remain ongoing. A full list of active projects can be found in the featured updates.

Background

The Cycling Master Plan (CMP) was first developed in 2010 and guides planning for cycling across the city. It is a long-term document that maps out a cycling network of existing and proposed cycling facilities designed to make it easy and safe for people to ride their bicycles, electric bicycles, scooters and e-scooters around the city. The CMP also includes policies, programs, a map and plans to support the implementation and use of the cycling network by the residents and visitors to Mississauga.

The CMP is a guide for where future infrastructure should be built, and which policies and programs should be enacted to achieve the CMP’s vision. It is not a detailed design plan for facilities, or an authorization for construction. The CMP is not a financial commitment to fund construction of the cycling network or implement identified programs.

Milestones
  1. 1
    Project initiation and cycling network review

    Confirm the existing and planned cycling network; review and update the goals and plans; develop a strategy for engagement and consultation

  2. 2
    Network validation

    Update the planned cycling network, based on best practices and input from technical experts

  3. 3
    Community engagement

    Connect with community organizations

  4. 4
    Prioritization of network

    Determine which cycling routes should be prioritized for implementation, including those most needed or with the greatest potential of being used frequently

  5. 5
    Feasibility analysis

    Create a short-term 5 Year Plan (2025-2030) and long-term plan (2031+) based on construction timelines, project type, feasibility analysis, and prioritization scores

  6. 6
    Community consultation

    Connect with residents

  7. 7
    5-Year Implementation Plan

    Finalize 5-year implementation plan

  8. 8
    Final report

    A comprehensive summary of all contributions collected and actionable recommendations, integrated into the updated Cycling Master Plan

  9. 9
    Design of priority cycling projects

    Begin design for identified priority cycling routes in the 5-year Implementation Plan

  10. 10
    Installation of cycling routes

    Begin building cycling routes; additional project specific technical and public consultation, as needed